Skip to main content
Home page
Site map
Search
Contact Us
 

News - May 2012

Ofgem sends back 95 per cent of Renewable Heat Incentive applications

Administrator confirms it is looking to simplify complex registration requirements for green incentive scheme read more

Myriad CEG publishes a regular emailed newsletter "Cleaner Energy Matters" containing articles on various... read more

The natural choice for heating

Myriad Banner Image

Our unique combination of experience and skills in the design and installation of biomass heating systems is supported by a first class product range. We can use this expertise and technology to help you to reduce your energy bills or help you to meet your Carbon Reduction Commitment (CRC). Our team of experienced engineers are there to provide you with the services including:

 

  • Initial planning & feasibility studies.
  • Complete design & installation of system.
  • Fuel selection and supply advice.
  • Selection of key components including boiler, buffer storage, fuel handling and storage.
  • After sales support.

Read a Case Study

Case Studies

From schools and colleges to business parks, factories and conference centres, we offer much more than the simple installation of a biomass boiler.

What a project might cost

Boiler, Size and Model Capital Cost *Saving against gas RHI Income Overall Benefit Return on capital Co2 reduction (Tonne p.a)
Firematic 100kW £87,000 -£676 £15,470 £14,794 17% 92
Firematic 150kW £98,000 -£1,014 £23,205 £22,191 23% 137
Biomatic 300kW £170,000 £2,029 £34,978 £37,007 22% 275
Biomatic 400kW £185,000 -£2,705 £46,637 £43,932 24% 366
Biomatic 500kW £200,000 -£3,381 £58,296 £54,915 27% 458
USF-W 800kW £275,000 £15,235 £93,274 £108,509 39% 732

 

All capital costs are estimates but include boiler,fuel handling system, buffer tank, flue and M&E costs for installation. Not including fuel container/energy centre or backup boiler. Fuel use based on 1500 time boiler capacity, and saving against gas based on dry wood chip @2.5p/kWh and piped gas@4p/kWh.

If you would like to find out more about starting a project with Rural Energy then please contact us.

back to top