The £35m Gainsborough Educational Village brings together all the secondary age pupils from four, old schools in the town into a new, state-of-the-art facility. Built on a green-field site just outside the town the new school will house 1200... Read the full case study
As part of a £2.3m expansion programme, Scarning Primary School in Dereham is now being heated using ground source heat pumps installed by Econic. The project has seen the capacity of the school increase from 210 to over 300 pupils. Seven new... Read the full case study
Construction began on the £7m, state of the art Rye Primary School in East Sussex in July 2007. The new building, which is to replace two older schools in the town, will be providing facilities for over 300 pupils. Econic was contracted to... Read the full case study
The pre-school at Stowupland in Suffolk has been in existence for over 30 years. It started out at the local village hall before moving into a room at a local primary school. Eventually in 2007, after serious fund raising efforts succeeded, the... Read the full case study