News - March 2014

Portable Panels: Helping Construction Cut Carbon

Myriad Solar PV is pleased to introduce a clever way to cut carbon on site: portable solar PV panels for... read more

Myriad CEG publishes a regular emailed newsletter "Cleaner Energy Matters" containing articles on various... read more

Renewable Energy Assurance Limited
MCS Approved Installer
British Photovoltaic Association
Safe Contractor Approved
Contractors Health & Safety Assessment Scheme - Accredited Contractor

Read case studies related to you

Image

John Ferneley College, Melton Mowbray

John Ferneley College is an academy in Melton Mowbray specialising in business and enterprise, providing pioneering education for students in Years 7 to 11 and positioned in the top 5% of the nation’s highest achieving schools.The... Read the full case study

Ratcliffe House & Darwin House, London

The construction of residential flats on the former Anerley School site in Penge, London was awarded to Taylor Wimpey.The Requirement Taylor Wimpey needed to meet Part L requirements on their latest project in London on the former Anerley School... Read the full case study

Windmill Walk, Eastbourne

Sited in the popular seaside town of Eastbourne, Sussex, Taylor Wimpey’s new housing development at Windmill Walk is made up of a collection of luxurious two, three and four bedroom properties. Taylor Wimpey, one of Britain’s biggest... Read the full case study

GrowHow Head Office, Cheshire

GrowHow has a big presence in the agricultural sector as the UK’s premier manufacturer of fertiliser and a major supplier to the Process Chemicals industry. Myriad Solar PV was chosen to design, supply and install their PV solution.The... Read the full case study

10 Hammersmith Grove, London

Number 10 Hammersmith Grove is a new build property comprising eight floors of spectacular office space with new restaurant units and stunning public terraces and garden spaces - and now has solar PV boosting its renewables portfolio.The... Read the full case study

Whetstone Pastures Farm, Leicestershire

Whetstone Pastures Farm has a very ethical approach to both the business and related endeavours. The site, as well as being an arable farm, has a Pick Your Own Fruit area, a children’s play barn, farm shop and Sandra, one of the owners,... Read the full case study

Marcol House, London

This development amalgamates three prominent sites in central London, 2 on Regent Street and one on Margaret Street. The scheme involved the retention of the façade of Marcol House and 295 Regent Street and the introduction of a new building... Read the full case study

Pipers Way, Swindon

A £25million new build development tender for Places for People, consisting of a total of 204 properties, was awarded to Wates, who then had to consider how to make the 36 houses, 168 apartments and 14 flats meet the Sustainable Homes Code 3... Read the full case study

Cherwell Leisure Centres

Increasingly, Cherwell District Council has been investing in a Sustainable Procurement Strategy plan. In October 2011, the council turned to Myriad Solar and awarded the company with two Solar PV contracts after a rigorous tender evaluation and... Read the full case study

London School of Economics and Political Science

The London School of Economics and Political Science located in Westminster, central London, is a public research university specialising in the social sciences and is a constituent college of the federal University of London. The university was... Read the full case study

Whitebeck Court, Manchester

Northward Housing awarded the contract to refurbish Whitebeck Court, a flagship retirement housing scheme, to Wates Living Space. The scheme also provides day care services to residents and the local community. The refurbishment was designed to... Read the full case study

Upper Aynho Grounds, Banbury

A Day in the Country, is an award winning provider of corporate hospitality and activity days set in over 250 acres of land near the picturesque village of Upper Aynho, Oxfordshire.The Requirement  Owners Richard and Jerry Stephenson approached... Read the full case study

Woolwich Civic Offices, Woolwich

Woolwich Civic Offices was a large, new build prestigious development for the established construction company Wates.Working alongside Wates and the consultant Hilson Moran Partnership, we achieved valued engineering savings for them and provided a... Read the full case study

Norbury Manor Business and Enterprise College

Norbury Manor Business and Enterprise College is a place of exciting and quick development.  They provide outstanding education, which is shown in their OFSTED reports and GCSE and A level results. Natural growth and success in their academic... Read the full case study

Clarence Street, Kingston

The Requirement The overall PV system had to meet a minimum output of 27,556kWh per annum, as per the stipulations of Part L, Planning and CODE 3.  As the building was located in a built-up area, solar PV was the preferred option for reneable... Read the full case study

Thorpe Close and King Henrys Drive, Croydon

Myriad CEG Solar have recently completed a PV project of thirteen new properties in New Addington, Croydon.Mansell approached us to supply the Solar PV systems. They built 13 new properties, six in King Henry‘s Drive and seven in Thorpe Close.... Read the full case study

Chalkhill School, Wembley

Myriad CEG have always embraced the notion that solar PV generation is a significant educational tool in the classroom.Our recent installation at Chalkhill School included full monitoring equipment linked to a classroom display enabling pupils and... Read the full case study

Lankaster Gardens, Finchley

This new development offers a stylish range of traditional homes set in an urban surrounding. The requirement was to place 144 Sharp modules mounted on standoff frames on three different roof structures to achieve 26 kWp, as per Scott Wilson... Read the full case study

Sudbury Primary School, Wembley

Morgan Sindall approached JCA Group to undergo the £3 million contract for the mechanical and electrical works involved in extending and refurbishing part of Sudbury Primary School.  The works were required by planning to meet a... Read the full case study

Romford Town Hall, Romford

The Requirement The Havering Borough Council invited Myriad CEG Power Ltd to supply, design and install a 10.0kWp Solar PV array retro-fit on Romford Town Hall Building.The Solution Myriad CEG won this contract through repeat business from Havering... Read the full case study

Sturtwood Farm, Surrey

Sturtwood Farm is a working cattle farm, as well as having barn units for retail, iron work and car works.The Requirement Myriad CEG was asked to establish how many PV panels would comfortably fit on to the two south facing barn roofs, yet remaining... Read the full case study

Chafford School, Havering

Myriad CEG Power Ltd and the The Chafford School in Havering are pleased to announce the installation of one of the largest solar photovoltaic systems at any UK school. The 150 panel system now provides a year round supply of renewable... Read the full case study

Foxley House, Towcester

The Requirement Martin has a large domestic property that is heated by electric heaters.  His requirement was to have clean and reliable renewable energy to decrease his large electricity bills.The Benefits Predicted Output: 21,460 kWh per... Read the full case study

Cobridge Primary Care Centre, Stoke-on-Trent

The new £14m NHS Cobridge Primary Care Centre includes a state of the art community health centre and a purpose built sexual health unit, which will offer a range of specialist services to benefit local communities. The partners involved in... Read the full case study

Elm Park Library, London Borough of Havering

Myriad Solar was approached by GML Construction to supply a suitable method of generating a renewable, sustainable and efficient energy supply as part of the rebuild of Elm Park Library, a low carbon sustainable project, in the London... Read the full case study

Ashlawn School & Science College, Rugby

Myriad Solar and Ashlawn School & Science College are pleased to announce the installation of a large PV System. The 100 panel system now provides a year-round supply of renewable energy as well as acting as an educational resource for the... Read the full case study

Castle Wood School, Coventry

Castle Wood is a purpose-built, single storey Special Education Needs School in Coventry, complete with its own internal swimming pool. The building was being designed to achieve BREEAM ‘Excellence’ which included the need for a roof... Read the full case study

Edward and Lansdowne Road, Alton

The requirement under the code for sustainable homes was to provide 25% reduction of CO² for each house. The contract was to Supply, Design and install 11, 925W Solar PV systems all with an individual connection to each apartment.Myriad were... Read the full case study

Hoe Valley Community Centre, Woking

The Hoe Valley Community Scheme is Woking Borough Council’s Project to take Woking homes out of the flood plain, provide a range of new community facilities and bring about improvements to both highways and public amenity areas.Myriad Power... Read the full case study