See how a Myriad CEG solar installation can reduce your energy costs - start today:
- Contact a Myriad CEG solar specialist
Myriad Solar are looking forward to the Greenbuild Awards ceremony on the evening of the 8th May. Our solar... read more
A £25million new build development tender for Places for People, consisting of a total of 204 properties, was awarded to Wates, who then had to consider how to make the 36 houses, 168 apartments and 14 flats meet the Sustainable Homes Code 3... Read the full case study
Increasingly, Cherwell District Council has been investing in a Sustainable Procurement Strategy plan. In October 2011, the council turned to Myriad Solar and awarded the company with two Solar PV contracts after a rigorous tender evaluation and... Read the full case study
A college of the federal University of London, LSE was founded in 1895 in Westminster. Since 2005, LSE has committed to acting responsibly to minimise its environmental impact as stated in its Environmental Policy.This aims to reduce the use of... Read the full case study
Northward Housing awarded the contract to refurbish Whitebeck Court, a flagship retirement housing scheme, to Wates Living Space. The scheme also provides day care services to residents and the local community. The refurbishment was designed to... Read the full case study
A Day in the Country, is an award winning provider of corporate hospitality and activity days set in over 250 acres of land near the picturesque village of Upper Aynho, Oxfordshire.The Requirement Owners Richard and Jerry Stephenson approached... Read the full case study
Woolwich Civic Offices was a large, new build prestigious development for the established construction company Wates.Working alongside Wates and the consultant Hilson Moran Partnership, we achieved valued engineering savings for them and provided a... Read the full case study
The Hoe Valley Community Scheme is Woking Borough Council’s Project to take Woking homes out of the flood plain, provide a range of new community facilities and bring about improvements to both highways and public amenity areas.Myriad Power... Read the full case study
Norbury Manor Business and Enterprise College is a place of exciting and quick development. They provide outstanding education, which is shown in their OFSTED reports and GCSE and A level results. Natural growth and success in their academic... Read the full case study
The Requirement The overall PV system had to meet a minimum output of 27,556kWh per annum, as per the stipulations of Part L, Planning and CODE 3. As the building was located in a built-up area, solar PV was the preferred option for reneable... Read the full case study
Myriad CEG Solar have recently completed a PV project of thirteen new properties in New Addington, Croydon.Mansell approached us to supply the Solar PV systems. They built 13 new properties, six in King Henry‘s Drive and seven in Thorpe Close.... Read the full case study
Myriad CEG have always embraced the notion that solar PV generation is a significant educational tool in the classroom.Our recent installation at Chalkhill School included full monitoring equipment linked to a classroom display enabling pupils and... Read the full case study
This new development offers a stylish range of traditional homes set in an urban surrounding. The requirement was to place 144 Sharp modules mounted on standoff frames on three different roof structures to achieve 26 kWp, as per Scott Wilson... Read the full case study
Morgan Sindall approached JCA Group to undergo the £3 million contract for the mechanical and electrical works involved in extending and refurbishing part of Sudbury Primary School. The works were required by planning to meet a... Read the full case study
The Requirement The Havering Borough Council invited Myriad CEG Power Ltd to supply, design and install a 10.0kWp Solar PV array retro-fit on Romford Town Hall Building.The Solution Myriad CEG won this contract through repeat business from Havering... Read the full case study
Sturtwood Farm is a working cattle farm, as well as having barn units for retail, iron work and car works.The Requirement Myriad CEG was asked to establish how many PV panels would comfortably fit on to the two south facing barn roofs, yet remaining... Read the full case study
Myriad CEG Power Ltd and the The Chafford School in Havering are pleased to announce the installation of one of the largest solar photovoltaic systems at any UK school. The 150 panel system now provides a year round supply of renewable... Read the full case study
The Requirement Martin has a large domestic property that is heated by electric heaters. His requirement was to have clean and reliable renewable energy to decrease his large electricity bills.The Benefits Predicted Output: 21,460 kWh per... Read the full case study
Myriad CEG Solar PV are pleased to announce the completion of a 22kWp PV System at West Hall Farm in September 2011. The system consists of 120 Sharp Monocrystalline 185 W panels, mounted on a corrugated roof.The client had been interested in... Read the full case study
The new £14m NHS Cobridge Primary Care Centre includes a state of the art community health centre and a purpose built sexual health unit, which will offer a range of specialist services to benefit local communities. The partners involved in... Read the full case study
Myriad Solar was approached by GML Construction to supply a suitable method of generating a renewable, sustainable and efficient energy supply as part of the rebuild of Elm Park Library, a low carbon sustainable project, in the London... Read the full case study
Myriad Solar and Ashlawn School & Science College are pleased to announce the installation of a large PV System. The 100 panel system now provides a year-round supply of renewable energy as well as acting as an educational resource for the... Read the full case study
Castle Wood is a purpose-built, single storey Special Education Needs School in Coventry, complete with its own internal swimming pool. The building was being designed to achieve BREEAM ‘Excellence’ which included the need for a roof... Read the full case study
The requirement under the code for sustainable homes was to provide 25% reduction of CO² for each house. The contract was to Supply, Design and install 11, 925W Solar PV systems all with an individual connection to each apartment.Myriad were... Read the full case study
The requirement was to maximise the potential of the available South facing roof space on a delicate agricultural barn building near Hailsham, constructed in the 1960’s.As such, a Myriad site survey team went into action to assess the... Read the full case study
The £25 million new build Harris Academy Falconwood project was constructed by Willmott Dixon. This impressive new construction will provide the students with a pro-active learning environment to encourage study and enhance their knowledge... Read the full case study
We were invited to supply, design and install a 39.6 kWp Solar PV array on the new build apartment and office block at Watford FC Football Ground, Vicarage Road.The building has been designed do wrap around the football stadium, it provides... Read the full case study
Myriad were in discussions with Peter over the course of 16 months, first exploring the idea of a possible 5KW wind turbine on the site and after carrying out the relevant surveys decided to put the project on hold. The client then later decided that... Read the full case study
See how a Myriad CEG solar installation can reduce your energy costs - start today: