Myriad Solar PV provides services and solutions to all parties in the construction industry:-
Developer: Extensive advice given from tender documents to choosing the right technology.
Specifier: Help provided with devising the best solution to meet environmental planning requirements.
Contractor: JCT or other construction design & build sub-contracts presented as a fixed price turnkey system compliant with ER’s.
Local Authorities are now also increasingly imposing planning conditions on new build properties that require a minimum percentage of renewable energy to be generated onsite. This is often referred to as the `Merton Rule’.
Other requirements, including ever more stringent building regulations and corporate needs to become greener, are also driving increases in the demand for renewable energy systems for buildings. These include adhering to the various BREEAM standards for sustainable buildings.
To see some of our projects in this sector please read our case studies.

