Use our online tool to estimate annual wind energy production. Determine expected revenue and system cost NOW... read more

News - April 2012

New Ipsos Mori poll finds 66% of UK public in favour of wind energy!

A recent survey carried out in the Ipsos Mori poll (commissioned by wind trade body Renewable UK) has revealed... read more

Myriad CEG publishes a regular emailed newsletter "Cleaner Energy Matters" containing articles on various... read more

Bringing Down The Cost of Wind

Check Your Wind Speed
Wind Speed Checker
Wind Speed

Myriad Wind is the largest provider of small and medium-sized wind turbines in the UK with more than 200 wind power installations in operation to date.
Modern wind systems can deliver a fast return on investment - sometimes within as little as five years.

Wind Turbines

We provide a choice for some of the most efficient and cost-effective wind turbines in the world from 11kW through to 2MW with trusted brands such as Gaia and Northern Power. View our extensive range of wind turbines to find a system suitable for your site and rate of return.

With our experienced team of engineers and planners we can safely take your project through the process of site selection, successful planning permission, grid connection and the construction phase. We have broken down the steps of wind turbine installation for your information and are happy to answer any questions you may have.

Contact us today to see how an effective wind turbine system can earn between £60,000 – £250,000 from your land and reduce the burden of increasing energy costs.

  • Site Selection
  • Feasibility
  • Planning
  • Grid Connection
  • Installation & Commission

Financial Incentives

The Government have introduced financial incentives for Renewable Power called the Feed-in Tariff (FiT). The scheme guarantees a minimum payment for 20 years which is index-linked and tax free for individuals.

To qualify for FiTs the wind turbine must be a Microgeneration Certification Scheme (MCS) approved turbine and be installed by a MCS approved installer.

The rate of income is expected to be determined by the size of the system as detailed below;

System Type

Size

Rate/kWh

Myriad Wind Systems

Wind

1.5kW-15kW 28.0p

1 X Evance R9000 or Gaia-Wind 133

Wind

15kW-100kW

25.3p

2 - 9 X Gaia 133 or 1 X Northern Power 100

Wind

100kW-500kW 19.7p

1 - 5 X Northern Power 100

Wind

500kW-1,500kW

9.9p

5 - 15 X Northern Power 100